arrow-graphic
line-graphic

3 Stockport Exchange, a 64,000 sq ft Grade A office building featuring a stunning communal roof terrace will complete in Summer 2023, marking the completion of the next phase of this £145 million flagship scheme.

A 399 space multi-storey car park with a green wall façade will also complete in summer 2023.

 

“We’re eight minutes from Manchester by train and the road and air links are ideal for national and international travel.”

Steve Oliver, CEO musicMagpie and Chair of Stockport Economic Alliance

Register Interest
Previous Next
line-graphic

Schedule of Areas

sq ft sq m
Ground Floor 7,226 671
First Floor 11,222 1,043
Second Floor 11,381 1,057
Third Floor 11,382 1,057
Fourth Floor 11,384 1,058
Fifth Floor Let to Hurst Let to Hurst
Total available 52,595 4,886
line-graphic

Specification

38 cycle racks, 4 showers, lockers and drying room

38 cycle racks, 4 showers, lockers and drying room

Floor to ceiling height of 2.85m on upper floors

Floor to ceiling height of 2.85m on upper floors

Dedicated on-site parking

Dedicated on-site parking

Three 13-person high speed passenger lifts

Three 13-person high speed passenger lifts

Air tightness of 3m<sup>3</sup>

Air tightness of 3m3

LED lighting

LED lighting

Energy efficiency rating of ‘A’

Energy efficiency rating of ‘A’

BREEAM Excellent rating

BREEAM Excellent rating

Fresh air rates of 12 litres per second

Fresh air rates of 12 litres per second

High speed fibre infrastructure provided by BT Openreach and Virgin Media

High speed fibre infrastructure provided by BT Openreach and Virgin Media

VRF comfort cooling and heating system at 1:8 sq m

VRF comfort cooling and heating system at 1:8 sq m

26 EV charging points

26 EV charging points

line-graphic

Live View

line-graphic

Register your interest

Full Name(Required)
This field is for validation purposes and should be left unchanged.

For all Enquiries

Cushman & Wakefield Contact CBRE Contact